KWA 3, Hannover

Art is the governor of Utopia.
(Max Frisch)

 

Scope of performance
Phase 2
Staff
K. Werner, V. Heidrich
Principal
et cetera GmbH
Planning time
2002
 
 
p 19 verw k9      p 19 verw k7
p 19 verw k8
  
 

A continuous five-storey structure is proposed, which corresponds particularly with the surrounding buildings in terms of the street space contours and which entails a clear boundary to the street.

Apart and different from this structure, an elliptical high-rise building situated almost parallel to the street area is proposed for 'project area I', which, as a suspended design, effectively distances itself from the five-storey building in terms of urban architecture.  

The demolition of the existing building fabric is proposed for 'project area II'.  This is to be re­placed by a compact and very economical office building (comb structure).  It is considered important to provide pedestrian access through a series of front courtyards.  By distancing itself from the inhospitable access road, an attractive forecourt was created to front the building, with a separate, appropriate entrance for each unit.

The basic approach to devising a solution for the whole project area meant creating a continuum of individual units with their own distinguishing features, which ‑ by virtue of being distanced from public and semi-public areas of the street landscape ‑ are able to express their own individuality.  Both for 'project area I' and 'project area III', this makes it an ideal ground-floor location for small-scale and large-scale retail uses (shops, restaurants etc.)


  • p_19_verw_k1
  • p_19_verw_k2
  • p_19_verw_k3
  • p_19_verw_k4
  • p_19_verw_k5
  • p_19_verw_k6